Xinrong 100MW PV Combined Power Station Project

Cases image
Others image

Project Overview

  • Project Type
    General mountain PV power station + mining subsidence area
    Project Capacity
    4,382,279MWh
  • Average Annual Power Generation
    175,291MWh
    Floor Area
    5,061 mu
  • Product Type
    Double-sided half-chip module + fixed bracket
Technical Highlights
1. PV power station is built in the coal mining subsidence area 2. The fully prefabricated cabin solution is adopted for the step-up substation 3. An intelligent O&M and fault diagnosis system is adopted to improve O&M efficiency. 4. The support is made of high-strength steel, and the amount of steel used for the support in the whole project is reduced by 468t. 5. Cable is purchased in batches, and the use process is carefully managed to avoid waste.

Project Highlights

1. The template construction is firstly adopted to unify construction standards, improve the construction quality, and avoid common quality problems. 2. The electrical processes for the foundation construction of box-type transformer, cable laying, and electrical wiring are strictly controlled, and the construction quality is excellent. 3. All risks of the project are controlled in advance, and the project progress meets the requirements.