LONGi TSE 2MW Ground-mounted Power Station Project in Thailand

Project Overview

  • Project Type
    Waster surface-mounted PV power station
    Project Location
    Thailand
  • Project Capacity
    2MW
    Product Type
    HI MO 5
  • Grid-connection Time
    March 2021

Project Highlights

The project was developed on March 3, 2021, and has been grid-connected recently and become the first floating PV project in Saraburi Province. LONGi has teamed up with TSE, the most influential PV power station operator and investor in Thailand, to provide 21MWp modules for the renovation of the Thai utility ground-mounted power station. With the excellent power generation performance of modules and the super strong delivery capability, "LONGi is the right choice to do the renovation".