LONGi Mexico Toyota Plant 499.22KW Project

Cases image
Cases image
Cases image

Project Overview

  • Project Type
    Industrial and commercial DG
    Project Location
    Apaseo el Grande Toyota Plant, Guanajuato, Mexico
  • Project Capacity
    499.22KW
    Product Type
    Hi-MO 5
  • Grid-connection Time
    September 2022

Project Highlights

The Project is located in Apaseo el Grande, Guanajuato, and produces 800 MWh of energy; besides, it can reduce 410 tons of carbon dioxide emissions every year.