LONGi Vietnam Binh Duong 2MW Project

Cases image
Cases image

Project Overview

  • Project Type
    Industrial and commercial DG
    Project Location
    Binh Duong, Vietnam
  • Project Area
    50,000 m2
    Annual Average Energy Output
    2,879 MWh
  • Project Capacity
    2MW
    Product Type
    Hi-MO 5
Technical Highlights
After the PV installation for the plant, the on-site temperature drops by 5-7 °C, and the carbon dioxide emissions are reduced by 2,314 tons per year.

Project Highlights

The 2 MWp system of LONGi's Hi-MO 5 modules is mounted on the rooftop with an area of 50,000 m2 to produce 2,879 MWh/year of clean energy for the plant.